Project History

Project History

Experience makes the difference

Production Line Optimization (China)

1. Project Overview 

Industry: Consumer Electronics
Company Size: 50–100 employees
Location: China
Project Duration: 6 months
Role: External Project and Quality Consultant; partly operating independently on-site and partly together with the German CEO on behalf of the parent company  

2. Initial Situation 

The production line was highly inefficient and operationally unstable:

  • Scrap rate exceeding 70%
  • No standardized in-process quality control
  • No structured final inspection
  • No reporting system or performance metrics
  • Approximately 90% manual production steps
  • High error rates due to adhesive application processes
  • No defined task descriptions for employees
  • Communication gaps between Germany and China due to insufficient consideration of cultural differences

Production was running, but structurally neither stable nor controllable.


3. Objectives

  • Reduce scrap rate to a competitive level
  • Introduce structured quality controls
  • Establish a reliable reporting and KPI system
  • Stabilize production processes
  • Define clear roles and responsibilities
  • Improve cross-cultural collaboration 


4. Approach

  • Comprehensive on-site process analysis
  • Identification of root causes (particularly adhesive-related defects)
  • Implementation of Lean principles to eliminate non-value-adding activities
  • Application of Six Sigma methodologies for root cause analysis
  • Introduction of a structured Quality Management System aligned with ISO 9001
  • Implementation of standardized in-process and final quality inspections
  • Development of a KPI-based reporting system
  • Adjustment of communication structures considering cultural aspects 


5. Results

  • Reduction of scrap rate from over 70% to 4% within six months
  • Significantly stabilized production processes
  • Transparent quality metrics
  • Systematic quality controls established
  • Improved cross-cultural collaboration 


6. Strategic Impact

The company achieved: 

  • Cost stability through drastic reduction of defective output
  • Improved production predictability
  • Increased product quality and delivery reliability
  • Sustainable process structures instead of short-term corrective actions
  • Strengthened international leadership and operational governance